Xinhua News Agency+| Reporter Goes Directly to the Embankment Reinforcement on Both Sides of the Daqing River | Flood | Embankment Reinforcement
Currently, the flood of the Daqing River is passing through Tianjin, and the water level in the Taitou section of the Daqing River, located in Jinghai District, Tianjin, has reached a historic high.
In recent days, a flood control and rescue team composed of multiple departments such as the People's Liberation Army, public security and fire protection, local cadres and masses, emergency rescue, and power and communication support has urgently constructed embankments for patrol.
Various types of engineering transportation, flood control and emergency vehicles continue to flow, and personnel and mechanical equipment on both sides of the river and the embankments in the Dongdian flood storage and detention area continue to work in a tense manner.
As an important flood discharge channel in the Haihe River Basin, the water level of the Daqing River continues to rise, and the flood control situation is severe.
As of 10:00 am on the 9th, the water level at the head of the Daqing River is close to 6 meters, approaching the peak of flood prediction. All parties are steadfast on the scene, fully preparing for the handling of sudden dangers, and making every effort to ensure the safety of the embankment.
Camera: Hao Jie
Produced by Xinhua News Agency's audio and video department