Ministry of Water Resources: Strengthening Emergency Obstacle Clearance and Embankment Inspection and Defense in Rivers to Ensure the Safety of Water Engineering and Flood Control | Engineering | Embankment
CCTV news: The Ministry of Water Resources announced that from July 30 to July 31, most of the Haihe River Basin will maintain heavy rain to rainstorm, and obvious flood processes will occur in the North Canal, Yongding River, Daqing River, Hutuo River, Fuyang River and other rivers. Among them, the North Canal, Daqing River, and Yongding River may experience floods with numbers or exceeding the warning level. The flood storage and detention areas such as Dongdian of Daqing River, Xiaoqing River diversion area of Beijuma River, Dahuangbao depression of Jianhe River in Qinglongwan, Ningjinpo of Fuyang River, and Dalu Ze may overflow and reach the conditions for use.
The Ministry of Water Resources has decided to upgrade the emergency response for flood prevention in the Beijing Tianjin Hebei region to level two at 12:00 on July 30th, and requires relevant provinces and cities to immediately enter the emergency response work state, quickly, meticulously, and orderly prepare for the use of flood storage and detention areas. At the same time, closely monitoring weather changes, rolling out rainfall and water situation prediction and forecasting, scientifically and accurately implementing water engineering flood control scheduling, fully utilizing backbone reservoirs to intercept floods and reduce peak shifting, strengthening emergency clearing of river channels and embankment inspections and defense, ensuring the safety of water engineering flood control, prevention of small and medium-sized river floods and mountain floods, and making every effort to ensure the safety of people's lives and property.