Ensure the absolute safety of flood control in the capital!, Minister of Water Resources Li Guoying "Inspects" Flood Control: Ensuring the Safety of People's Lives and Property in Daqing River | Ziya River | Inspection and Guidance
The Ministry of Water Resources launched the Level II emergency response for flood prevention to fully respond to rainstorm and flood in Beijing Tianjin Hebei region
Influenced by typhoon "Dousuri" and cold air, from 8:00 on July 28 to 8:00 on July 30, heavy rainfall occurred in the central and southern parts of the Haihe River basin, mainly from rainstorm to heavy rainstorm, of which extremely heavy rainstorm occurred locally in Zhangweinan Canal, Ziya River and other water systems; The cumulative surface rainfall in the Haihe River Basin is 50 millimeters, including 125 millimeters for the Zhangwei South Canal, 82 millimeters for the Ziya River, 73 millimeters for various rivers in the Heilonggang Yundong region, 68 millimeters for the Tuhai Majia River, 51 millimeters for the Daqing River, and 39 millimeters for the North Canal. The cumulative maximum point rainfall is 541 millimeters for Nanyao in Xinxiang, Henan, 392 millimeters for Madiantou in Handan, Hebei, and 372 millimeters for Ewu in Changzhi, Shanxi. Affected by rainfall, two small and medium-sized rivers in Shanxi, including Qingzhangdong River, a tributary of Zhanghe River, and Songxi River, a tributary of Hutuo River, have experienced over warning floods, with over warning amplitudes of 0.84 meters and 2.02 meters respectively. Currently, the water level of Songxi River is still rising.
Influenced by the residual circulation of "Dusurai" and cold air, there was a heavy rain to rainstorm in Haihe River Basin on July 30, including heavy rainstorm to extremely heavy rainstorm in some areas of Ziya River, Daqing River, Yongding River, Beisan River and other water systems, and there will still be a heavy rain to rainstorm in some areas of Haihe River Basin from July 31 to August 1; Rivers such as Chaobai River, Beiyun Canal, Yongding River, Daqing River, and Ziya River will experience significant water rising processes. Among them, Beiyun Canal, Yongding River, Daqing River, and Ziya River may experience floods with numbers or exceeding the warning level. The Beiyun Canal system is located in Dahuangpu Wah, the Daqing River system is located in Xiaoqing River, Langou Wah, and Dongdian, and the Ziya River system is located in the Daze and Ningjinpo flood storage and detention areas, which may divert or naturally overflow into the flood.
On July 28, Li Guoying, Deputy Commander in Chief of the National Defense General and Minister of Water Resources, presided over a special meeting of the Chamber of Commerce. He made a video link with Beijing, Tianjin, Hebei, Shanxi, Shandong, Henan and other provinces and cities as well as the Haihe River Water Conservancy Commission, focusing on the deployment of rainstorm and flood prevention work in the Haihe River basin. For six provinces and cities to launch Level III emergency response for flood prevention, seven working groups were sent to all parts of the Haihe River basin and along the middle route of the South to North Water Transfer Project to assist in guiding the defense work and fully respond to rainstorm and flood. Minister Li Guoying led a working group of the Ministry of Water Resources to inspect and guide the flood prevention work of the North Canal in the Beijing Tianjin Hebei region on the 29th. Liu Weiping, Vice Minister of the Ministry of Water Resources, presided over the daily consultation, analyzed and judged the situation of typhoon, rainstorm and flood on a rolling basis, and refined and implemented the preventive measures. The Ministry of Water Resources promptly issued an orange flood warning, with a daily "one province, one order" targeted warning, urging and guiding local authorities to do a good job in the safe flood control of reservoirs, ongoing projects, and the prevention of floods in small and medium-sized rivers and mountain floods, as well as the preparation for the use of flood storage and detention areas. According to the development trend of flood situation, the Ministry of Water Resources upgraded the emergency response for flood prevention in Beijing, Tianjin, and Hebei to level II at 12:00 on July 30th, and issued notices to the water conservancy departments of three provinces and cities and the Haihe Water Resources Commission to further arrange and deploy various defense work.
![Ensure the absolute safety of flood control in the capital!, Minister of Water Resources Li Guoying "Inspects" Flood Control: Ensuring the Safety of People's Lives and Property in Daqing River | Ziya River | Inspection and Guidance](https://a5qu.com/upload/images/6a4b65360f0524f8acf14ef789ef0c20.jpg)
The water conservancy department dispatched water conservancy projects such as the Beiguan Hub of the North Canal, the Baiyangdian of the Daqing River, and the Huangbizhuang Reservoir to pre release and pre lower the water level to meet the flood. The Zhuzhuang Reservoir of the Ziya River reduced the peak inflow flow from 2450 cubic meters per second to 200 cubic meters per second, with a peak shaving rate of 92%, greatly reducing the downstream flood control pressure.
Li Guoying goes to Beijing-Tianjin-Hebei to inspect flood prevention preparations in the North Canal basin
Li Guoying inspected the Shisanling Reservoir in Beijing
Li Guoying inspects the Songzhuang flood storage and detention area in Beijing
![Ensure the absolute safety of flood control in the capital!, Minister of Water Resources Li Guoying "Inspects" Flood Control: Ensuring the Safety of People's Lives and Property in Daqing River | Ziya River | Inspection and Guidance](https://a5qu.com/upload/images/c0270df0e109f7bb9a1a954c35e59767.jpg)
According to the website of the Ministry of Water Resources, on July 29th, Li Guoying, Deputy Commander in Chief of the National Defense Administration and Minister of Water Resources, went to Beijing, Hebei Province, and Tianjin to inspect the flood prevention preparations in the North Canal Basin.
It is predicted that due to the combined effect of the 5th typhoon "Dussuri" moving northward and cold air this year, there will be continuous rainstorm in the Haihe River basin from July 29 to August 1, and the North Canal may have an over alert flood. Li Guoying went deep into Beijing's Thirteen Tombs Reservoir, a tributary of the North Canal at the mouth of the Ba River, the Songzhuang Flood Storage and Detention Area, the Beiguan Hub, the Xianghe section of the North Canal in Hebei Province, the Tumenlou Hub, the Qinglongwan Reduction River, the Langerwo Flood Diversion Sluice, and the Dahuangbaowa Flood Storage and Detention Area along the North Canal from the source. He gained a detailed understanding of the flood control engineering system and flood control scheduling plan in the basin, and conducted on-site analysis and judgment with relevant officials in the Beijing Tianjin Hebei region on rainfall forecasting, flood prevention preparation, and engineering scheduling.
Li Guoying inspected the Tumen Tower hub in Hebei Province
Li Guoying inspected the Langerwo diversion gate in Tianjin
![Ensure the absolute safety of flood control in the capital!, Minister of Water Resources Li Guoying "Inspects" Flood Control: Ensuring the Safety of People's Lives and Property in Daqing River | Ziya River | Inspection and Guidance](https://a5qu.com/upload/images/2b4cf77d3af1294f907d870a13770c2f.jpg)
Li Guoying pointed out that the current flood control in the North Canal Basin has entered a state of "imminent danger". It is necessary to anchor the goal of "no casualties, no dam collapse in the reservoir, no breach of important embankments, and no impact on important infrastructure", mobilize in an all-round way, be prepared, plan from the worst to the best, fight actively and prepare for the battle, pay close attention to all preparations in the window period before the flood, let the defense measures run faster than the flood, ensure that the thought is in place, the responsibility is in place, and the measures are in place, and resolutely win the battle against rainstorm and flood.
Li Guoying emphasized the need to strengthen the measures of forecasting, early warning, and rehearsal plans, use the "three lines of defense" of rainwater monitoring and forecasting, encrypt forecasting and rolling forecasting, accurately calculate the flood water level, volume, peak, and evolution process of each river section, and provide accurate information support for flood prevention work. We should follow the urban flood control concept of "rejecting, bypassing, and discharging", fully leverage the "combination fist" role of the basin flood control engineering system composed of reservoirs, rivers, embankments, and flood storage and detention areas, comprehensively consider the upstream and downstream, left and right banks, and main and tributaries, comprehensively analyze incoming water, storage, diversion, and discharge, finely study the boundary conditions, working conditions, and impacts of engineering application, and accurately determine the timing, sequence, and flow rate of application. The Shisanling Reservoir should fully play its role in flood control and peak shaving while ensuring the safety of the dam and reservoir area. The Songzhuang flood storage and detention area should be prepared for flood diversion and use in a timely and decisive manner, and make every effort to reduce downstream flood control pressure. The Beiguan Hub should take the North Canal as its core, take into account the transportation of the Huihe River and the tidal reduction of the river, and quickly determine the scheduling and application plans to cope with different risk combinations, achieving scientific scheduling, systematic scheduling, and safe scheduling. The Tumen Tower hub needs to accurately divert floodwater based on the upstream inflow and downstream North Canal channel, Qinglongwan Jianhe River channel's flood discharge capacity, and the operating conditions of the Dahuangbaowa flood storage and detention area. The Dahuangbaowa flood storage and detention area should comprehensively inspect the preparation for operation and improve personnel transfer and evacuation plans. We need to increase inspection efforts on river embankments, pre arrange emergency personnel, materials, and equipment in advance, and strictly prevent embankment breaches.
Li Guoying emphasized that the Haihe River Basin Flood Control Bureau should strengthen unified command and overall coordination, and the flood control departments of the Beijing Tianjin Hebei provinces should closely cooperate to jointly do a good job in the organization and scheduling of flood control in the basin.