Emergency investigation of roadside trees, green spaces, and outdoor facilities in Shanghai, Typhoon "Dussuri" on trees on the road | Typhoon | Shanghai
Early this morning, Shanghai Chenshan Botanical Garden took precautions and draped over 150 Wanglian plants in the park with a windproof veil. After the typhoon, maintenance personnel will try to make up for the losses caused by the typhoon by pruning dead leaves and applying thin fertilizer frequently.
In order to properly respond to the impact of Typhoon Dussuri, the fifth typhoon of this year, the greening and urban appearance departments at all levels in Shanghai strictly implement flood and typhoon prevention plans, strengthen bottom line thinking and risk awareness, take early action, seize the initiative, and be prepared to do a good job in typhoon Dussuri prevention and response.
In terms of parks, green spaces, and roadside trees, green departments at all levels should strengthen emergency duty in accordance with the requirements of "prevention first, and preparedness". As of 9:00 am on July 28th, a total of 4328 people from the 457 green line detachment in the city were on standby, with 2129 patrols and 439 emergency response personnel. Seven large broken branches were found in roadside trees, two fallen trees in green spaces, and two large broken branches. All of them have been disposed of so far.
![Emergency investigation of roadside trees, green spaces, and outdoor facilities in Shanghai, Typhoon "Dussuri" on trees on the road | Typhoon | Shanghai](https://a5qu.com/upload/images/bdad61a8e41220f3dffbd57b22513a25.jpg)
In terms of road cleaning, the city has 335 emergency support teams and 4960 emergency support personnel on standby at any time. Nearly 25000 sanitation workers promptly collected and cleared road waste bins, strengthened cleaning and upkeep of 1121 sections prone to waterlogging, and removed garbage and fallen leaves from drainage outlets.
In terms of outdoor advertising, signage, and landscape lighting facilities, the city's landscape management units will inform and inspect the outdoor advertising, signage facility setters, and landscape lighting facility construction and operation units again, requiring further implementation of preventive measures and increased efforts to rectify identified hidden dangers. As of 9:00 am on July 28th, a total of 52 hidden danger problems have been rectified in the city, and no safety accidents such as facility falls have occurred.
The Shanghai Greening and Urban Appearance Bureau stated that the next step will be to strictly follow the requirements of the flood prevention department, strengthen duty and continue to carry out inspections and inspections of roadside trees, green space trees, outdoor advertising, signs and other facilities, increase road patrols, timely remove garbage, and ensure safe flood season.
![Emergency investigation of roadside trees, green spaces, and outdoor facilities in Shanghai, Typhoon "Dussuri" on trees on the road | Typhoon | Shanghai](https://a5qu.com/upload/images/76b3c086fc738733717cadad4ff99d1f.jpg)